IMG_1953

MCNP Case Study – Dry Cask Shielding

Tuesday, March 28th, 2017

We were contracted to build a complete Dry Cask shielding package for a BWR plant that had never done a Dry Cask campaign before and who was using a storage system that had never been used at a BWR before. The design challenge was to work within a given weight limit and provide the maximum dose reduction possible without adding any weight to the work platform.